Skip to main content

Mobilizing stakeholders for implant removals in Burkina Faso using landscape assessment data

Abstract

Background

Successful efforts to encourage uptake of subdermal contraceptive implants, with a lifespan of three to five years, necessitate planning to ensure that quality removal services are available when desired. In Burkina Faso, implant use has tripled over the past 8 years and now comprises almost half of the contraceptive method mix. Population Monitoring for Action (PMA) surveys identified barriers to obtaining quality removal when desired, particularly when the implant is not palpable, or providers lack needed skills or supplies. The Expanding Family Planning Choices (EFPC) project supported ministries of health in four countries with evaluation and strengthening of implant removal services.

Methods

An implant removal landscape assessment was conducted at 24 health facilities in three regions of Burkina Faso with high implant use that included provider observations of implant removal, interviews with providers and health facility managers, and facility readiness surveys. The project used landscape data to mobilize stakeholders through a series of participatory workshops to develop a collaborative roadmap and commit to actions supporting quality implant removals.

Results

Landscape findings revealed key gaps in provision of quality removal services, including high levels of provider confidence for implant insertion and removal (82% and 71%, respectively), low competence performing simple and difficult removals (19.2% and 11.1%, respectively), inadequate supplies and equipment (no facilities had all necessary materials for removal), lack of difficult removal management systems, and a lack of standard data collection tools for removal. Exposure to the data convinced stakeholders to focus on removals rather than expanding insertion services. While not all roadmap commitments were achieved, the process led to critical investments in quality implant removals.

Conclusion

Landscape data revealed that facilities lack needed supplies and equipment, and providers lack skills needed to perform quality implant removals, limiting client reproductive choice. Disseminating this data enabled stakeholders to identify and commit to evidence-based priority actions. Stakeholders have since capitalized on program learnings and the roadmap, including following MOH guidance for implant removal supplies and health provider training. Our experience in Burkina Faso offers a replicable model of how data can direct collective action to improve quality of contraceptive implant removals.

Peer Review reports

Background

The need for quality contraceptive implant removal services

In recent years, subdermal contraceptive implant use has gained popularity and has surged in use worldwide, with the highest rates of uptake in sub-Saharan African countries [1, 2]. Launched in 2013, the Implants Access Program (IAP), a public–private global collaboration, has been working to make implants accessible to women in low-income countries. Most notably, the IAP halved the price of implants globally through a volume guarantee and efforts to improve market dynamics [3]. The IAP has also worked to strengthen supply chain performance, train providers in insertion and removal, and increase community knowledge and awareness about long-acting reversible contraceptives (LARCs).

In Burkina Faso, uptake of modern contraceptive methods has climbed steadily in recent years; Performance Monitoring for Action (PMA) surveys have found that the modern contraceptive prevalence rate for women in unions increased from 18.1% in 2014 to 30.8% in 2019 [4, 5]. In part due to the volume guarantee, contraceptive implants account for half of this increase, rising from 41% of the method mix in 2014 to 50.3% in 2018, but declining to 44.1% in 2020 [4,5,6]. Both two-rod (Jadelle and Levoplant) and one-rod (Implanon NXT) implants are available in Burkina Faso, but more than 92% of implant users use two-rod products [6]. Burkina Faso’s national health management information system (HMIS) documents that the number of new users of implants has more than tripled from 2011 to 2020, from 55,044 to 187,290 [7, 8]. The vast majority of implants—more than 97%—are provided through public facilities [5]. Implants are also provided to clients during special family planning (FP) weeks, as well as via outreach services in both the public and private sectors.

An implant is effective for three to five years, though clients may elect removal prior to this point if they desire to become pregnant, wish to change contraceptive methods, or have any other reason for discontinuation [9]. From a rights perspective, ensuring on-demand access to quality implant removal services helps keep the promise of LARCs—that they are not only long-acting but also reversible—therefore safeguarding clients’ reproductive choice [10, 11]; access is also programmatically important as it supports continued demand for and client satisfaction with implant use, particularly in countries where contraceptive implant use has rapidly scaled up [10, 12]. However, recent global data have shown that clients do not have access to high-quality implant removal services [10, 13, 14], including in Burkina Faso, where 2018 PMA data identified an unmet need for removals of 7% [6]. While implants have grown in popularity, they remain a provider-dependent method: a client requires a provider to insert the implant to start the method and to remove the implant to stop using it, whether the method has reached the end of its effectiveness or the client wants to discontinue for any reason [10, 15].

Implants can usually be removed easily through a small opening in the skin; rarely, implants are difficult to remove because they are non-palpable, have migrated, were incorrectly inserted, or have grown encased in fibrous tissue [16]. Provider skills required for difficult contraceptive implant removals can exceed those required for standard removals. Difficult removals may require specialized provider training and equipment such as radiography and/or ultrasound when the implant is not palpable [16]. In Burkina Faso, currently only secondary and tertiary referral centers (Regional Hospital Center [CHR] and University Hospital Center) and some primary referral centers (CMA) have the required equipment to carry out removals for deeply inserted implants [17, 18]. Ultimately, the Ministry of Health (MOH) plans to extend provider training in difficult removals to all second and third level health facilities and health districts that have adequate equipment for the removal of deeply inserted contraceptive implants. This may reduce the distance a women must travel to reach a facility and provider capable of removing her implant.

Engagement and mobilization around quality FP services in Burkina Faso

Over recent decades, the Government of Burkina Faso has committed to promote FP for the wellbeing of its population. These objectives are enshrined in the National Family Planning Acceleration Plan 2017–2020 (PNAPF) which commits to increase knowledge of and access to rights-based FP services [19]. Improving the quality of contraceptive implant removal services is an integral part of MOH efforts to systematically improve quality and supply of modern contraceptives and stimulate demand for these products.

To address the urgent need to ensure quality implant removal services, the Bill & Melinda Gates Foundation awarded Jhpiego a short-term grant through the Expanding Family Planning Choices (EFPC) Project, from May 2018 to February 2020. EFPC provided short-term technical assistance to support four countries with high implant use (Burkina Faso, the Democratic Republic of Congo, Nigeria, and Tanzania) to evaluate and strengthen quality implant removal services in alignment with each country’s family planning roadmap and in direct partnership with its ministry of health.

In Burkina Faso, we conducted a landscape review and used resulting data to engage MOH and other FP stakeholders to support quality contraceptive implant removal services. Lessons learned from this experience outline a replicable model for engagement of FP stakeholders around quality contraceptive implant removal that is readily adaptable to other contexts and sectors.

Methods

Project adaptation and development

The EFPC project focused on eight conditions for quality implant removal services developed by the Global Implant Removal Task Force, a consortium of more than 20 key FP partners and donors, as part of the IAP Operations Group. This framework categorizes the components that must be met to ensure that a client has access to quality implant removal services [10] (Fig. 1).

Fig. 1
figure 1

Client-centered conditions for ensuring access to quality implant removal. Source: Implant Removal Task Force of the Implants Access Program Operations Group

A pivotal first step in engaging and mobilizing key stakeholders was to present the project to the Direction de la Santé de la Famille (DSF) [Directorate of Family Health], the department in charge of FP at the MOH. Acknowledging that the quality of contraceptive implant removal services merited attention, the DSF took the lead to mobilize other MOH stakeholders, including central directorates, regional directorates, and districts. The DSF organized meetings with them to present the project and encourage their involvement in the landscape assessment and other activities.

Landscape analysis

To amass evidence to sensitize stakeholders to the need for quality removals, we conducted a landscape analysis at the inception of the project. The landscape assessment protocol was approved by the Burkina Faso Health Research Ethics Committee and by the Johns Hopkins University Institutional Review Board, which granted a non-research determination. The analysis included a desk review and primary data collection to evaluate the current status in Burkina Faso of four of the eight client-centered conditions for quality implant removal: competent and confident provider, supplies and equipment in place, implant removal data collected and monitored, and systems in place for managing difficult removals. These four conditions were prioritized based on the team’s background understanding of implant insertions and removals in Burkina Faso and feasibility of interventions to improve these conditions during the project period.

Primary data collection for the landscape analysis was descriptive and cross-sectional, combining quantitative and qualitative methods including provider observations, a facility assessment, and interviews with providers and facility managers to address four main research aims (Table 1). Three of Burkina Faso’s thirteen regions were selected to participate in the landscape analysis based on having had the highest number of implants inserted in 2017. The rationale for their selection was that areas with the most insertions will ultimately have the greatest need for removals, and these regions could thus serve as an early barometer of how well conditions for quality removals were being met. The top two health districts (district sanitaire) [DS] in number of implants inserted were selected from each region; within each district, the central facility in the district (hospital or CMA) and the three health facilities with the highest number of implants inserted were selected. Twenty-four health facilities were ultimately included in the landscape analysis, using the four tools described in the table below.

Table 1 Landscape assessment research aims and data collection tools

Informed written consent was received from all study participants, including observed providers, clients who had their implant removal conducted by a provider observed by the study team, and health facility managers. Clients who were illiterate in French were consented in their local language and provided their consent by giving their fingerprint to the consent form.

For provider observations, trained data collectors working under the supervision of a principal investigator with support from the MOH used an implant removal skills checklist (see Additional file 1) to clinically observe 35 service providers from 24 health facilities on implant removal technique in simple and difficult removal situations. The checklist was adapted from the USAID Maternal and Child Survival Program LARC Learning Resource Package module on contraceptive implants [20], and is available as Additional file 1 in appendix. Data collectors provided providers with all tools required to safely and correctly perform one simple or difficult implant removal, including modified vasectomy forceps, sterile gloves, gauze, scalpel, and a Gaumard RITA Reproductive Implant Training Arm if a real client was not available. All providers working in health and social promotion center (CSPS) or medical center (CM) maternity units were eligible to participate in clinical observations, but if more than one provider offered implant removal services at the CSPS/CM, the provider responsible for the maternity or the maternal and child health department was selected. At higher-level facilities with more providers, such as a medical center with surgical services (CMA), CM, regional hospital center (CHR), or urban CSPS, 3 providers were selected via drawing to be observed. Data collectors used inclusion and exclusion criteria to refine the selection of eligible providers. Inclusion criteria included a facility offering implant removal in the target zones, being an authorized provider for implant removal in the chosen facility, being a facility manager in a selected facility, and willingness to participate in the study.

Data collectors visited facilities during days and times when services were offered, Monday through Friday. Health facilities were aware that data collectors were coming and in some areas, providers notified clients who were in need of removals in advance. Each provider was asked to perform one simple or difficult implant removal, whether on a real client or on a RITA model, using provided materials. Simple removals were performed on clients, but if no client was present, service providers performed removals on the RITA arm. Due to a lack of available clients with difficult removals during the collection period, all deeply inserted implant removals were performed on the RITA arm by providers at level 2 facilities (CHR or CMA). The data collection team assessed providers using the checklist.

Steps assessed included counseling prior to removal, preparation for removal, removal, reinsertion, and post-removal care and counseling. The composite score on the checklist was used to rate provider mastery as good (80–100%), partial (50–79%), or non-mastery (0–49%). All observed providers were interviewed post-observation about their experiences and challenges with implant insertions and removals, including training levels, their confidence performing procedures, and interactions with clients using a structured questionnaire (see Additional file 2).

At each health facility where a facility manager was present, the facility manager was asked about facility readiness to provide implant removal services, using a facility assessment checklist adapted from the globally available Contraceptive Implant Removal: Rapid Service Readiness Assessment Tool developed by Jhpiego [21] (see Additional file 3), which documented availability and condition of materials and equipment needed for implant insertion and removal observed and functioning on the day of the visit, classified by 1) items required for insertions, 2) items required for simple and difficult removals, and 3) equipment and commodities necessary for infection prevention. Each facility manager was also interviewed using a structured interview guide (see Additional file 4) to better understand challenges and systems in place for implant removals, referrals for removals, availability of protocols and tools in health facilities, and staff training.

Stakeholder mobilization process

Very limited funding necessitated strategic mobilization of and collaboration with stakeholders to identify and rank program priorities. In partnership with the DSF, the EFPC project first mapped key stakeholders, including Ministry of Health staff, regional and district government staff, and representatives from health facilities, civil society organizations (CSOs), non-governmental organizations (NGOs), and other technical and financial partners.

The project held multiple workshops to mobilize stakeholders identified through mapping (Fig. 2), including two sensitization workshops with DSF staff in January 2019, one with regional directorates and districts, and one with stakeholders from family planning organizations. At the third and fourth workshops, held in March 2019, stakeholders identified priority actions to address implant removal problems by working in small groups with an in-depth analysis of the landscape findings. Each group was asked to identify “low-hanging fruit”: actions to improve the quality of contraceptive implant removal services achievable within six months. These priority actions were used to generate a roadmap for improving contraceptive implant removal services in Burkina Faso.

Fig. 2
figure 2

Stakeholder mobilization workshops

Stakeholders then committed to implement roadmap activities based on their area of intervention expertise. Actions selected by each stakeholder had to be either already aligned with or easily incorporated into their current workplans. To facilitate this process, EFPC developed a commitment framework that each stakeholder used to select priority actions in the roadmap to address. After the workshop, the project held quarterly meetings with stakeholders over the following twelve months, which allowed stakeholders to share updates on roadmap implementation and progress towards their commitments. Stakeholders were subsequently encouraged to engage with other CSOs, NGOs, technical and financial partners, and other ministerial departments working in family planning and reproductive health (FP/RH). The EFPC project also engaged stakeholders from other ministries around the broader aspects of the need for quality FP services. A post-implementation workshop was held in March 2020 for representatives from the MOH, NGOs, donors, and the health system to review roadmap achievements and solicit recommendations from stakeholders to continue achievement of roadmap goals and ensure sustainability and scale-up of implant removal achievements in Burkina Faso.

Results

Landscape assessment results

Provider clinical observations

Of the 35 providers observed, 25.7% performed the removal on a client; 74.2% performed the removal on the RITA arm due to lack of clients presenting for removals during data collection. Difficult removals accounted for 28.6% of all removals (9 out of 35 removal cases) observed, and were all performed on an anatomical model due to a lack of clients presenting with difficult removals during the study period. Five of 26 (19.2%) providers observed were evaluated as competent on simple removals and 1 of 9 (11.1%) were competent on difficult removals; overall, 82.8% of providers demonstrated a lack of competence in removing implants following standard procedures. Table 2 shows provider competence by type of removal.

Table 2 Level of competency of service providers observed by district for each type of removal

Table 3 summarizes provider competence using the procedure checklist for simple and difficult removals. Providers had the highest mastery for pre-removal tasks (e.g., handwashing, antiseptic skin preparation), the removal itself, and pre-removal counseling (e.g., welcoming the client, describing the procedure) and lowest scores in post-removal counseling (e.g., follow-up steps, counseling for another contraceptive method if desired), and getting ready (e.g., ensuring tools are ready, palpating the implant rod).

Table 3 Percentage of service providers with a good mastery of simple and difficult removal steps by region and district

Provider interviews

Table 4 highlights reported confidence of observed service providers for implant insertion and removal. Approximately 83% of service providers said they were confident or very confident in implant insertion, and 71% said they were confident or very confident in implant removal.

Table 4 Confidence of observed service providers by region

In interviews, 37% of service providers stated that they had witnessed situations where a client requesting implant removal did not receive it. The majority of service providers who experienced difficulties related to implant removal or with using removal instruments and equipment mentioned deep insertion (65.7%) and defective or missing forceps (71.4%) as the main challenges. Table 5 below provides additional details.

Table 5 Service providers who have experienced difficulties in implant removal services

Providers and managers indicated that quality of removal services was limited or jeopardized by a lack of necessary protocols, materials, and equipment, including a lack of infection prevention and control materials, and materials such as modified vasectomy forceps or curved and straight mosquito forceps required for removals.

Facility assessment

Table 6 highlights that no facility had the necessary equipment for insertion and removal, while 75% had equipment and supplies for infection prevention.

Table 6 Number of health facilities with materials and equipment per type of implant service by region

Seventeen percent and 13% of facilities had an ultrasound or X-ray machine, respectively. Eight percent had a functional autoclave, 46% had a functional sterilizer, and 25% had a pressure cooker, raising concerns about the sterilization of materials. No facilities (0 of 24) had appropriate forceps for removal (modified vasectomy forceps or the curved and straight mosquito forceps). While implant insertion and removal services were available at all health facilities included in the landscape assessment and offered 7 days per week (except at facilities in Hauts-Bassins, where services were available 5 days per week), few facilities had guidelines on implant removal. 16.6% of facilities (4 of 24) reported having guidelines, checklists, or other learning materials on hand for implant removal. Those that reported having these guidelines pointed to posters, checklists, or training materials from district-level trainings. Table 7 describes the presence of available supplies for simple and difficult removals, as well as infection prevention, in study facilities by region and health district.

Table 7 Availability of materials and equipment for implant services by region and district

Manager interviews

While data collectors tried to meet with decision-makers or managers at all study facilities (n = 24), decision-makers or managers were only available at 21 facilities when data collectors conducted their visits. Difficulties managers reported included provider lack of competency, lack or inadequacy of materials/equipment, lack of specific data collection methods for implant removals, and lack of communication between providers and clients on availability of implant insertion and removal services. No facility had a specific system in place to manage difficult implant removal cases; managers reported that they are handled on a case-by-case basis and referrals are generally made to higher level facilities, believing these facilities have more competent providers and materials and equipment needed to perform difficult removals.

Managers identified issues tracking implant removal data, as implant removal data were not routinely collected in the usual data collection system, whether for use at the facility level or at the district or national levels. All health facilities identified difficulties in collecting and managing data due to the lack of suitable tools for data collection, leading to non-reporting or under-reporting of removals. Managers noted that those who report removal cases use FP documents (client’s logbook, notebook, or file), but these documents capture no standard information on implant removals. Some reported using the area documenting method change to record removals. Some managers noted that removals performed during shifts (generally 12:00 a.m.-3:00 p.m. or 5:00 p.m.—7:00 a.m.) may not be recorded because of provider workload during shifts.

Stakeholder Mobilization Results

Stakeholder mapping captured a total of 33 institutions/organizations who were invited to participate in the series of stakeholder workshops, where they were sensitized to concerns about the quality of contraceptive implant removal services revealed by the landscape assessment. Stakeholders were initially resistant to the need to focus on implant removals, believing that quality implant removal was not a large problem, that providers already had the requisite removal skills, and that the focus should be on implant insertions rather than removals. Highlighting gaps identified in the landscape assessment was a key strategy to raise awareness among stakeholders and to define priorities for action to improve the quality of removal services.

At the third and fourth workshops, a total of 15 priority actions, each of which was linked to a client-centered condition for contraceptive implant service delivery, were identified based on the landscape analysis findings and included in the roadmap. Feedback shared during these meetings indicated that the dissemination of the landscape assessment findings had alerted stakeholders to shortcomings in the quality of contraceptive implant removal services. Mirroring the breadth of the desk review, the workshop working group expanded the roadmap beyond the initial four priority client-centered conditions. After the roadmap was designed, implementing partners committed to priority actions. An example of a completed stakeholder commitment framework is presented in Table 8.

Table 8 Example of Framework for Stakeholder Commitment to the Implant Removal Quality Improvement Roadmap

Outcomes of the EFPC project, including stakeholder contributions, are presented below by roadmap priority action (Table 9).

Table 9 Priority Actions, Activities, and Outcomes of the Quality Implant Removal Roadmap

At the post-implementation workshop, stakeholders made several recommendations, detailed in Table 10.

Table 10 Stakeholder Recommendations

Discussion

Most research to date on contraceptive implant removal services in low- and middle-income countries has emerged from a handful of countries and has focused primarily on issues of client access, client satisfaction, and the feasibility and safety of strategies like task-shifting to community health workers to accelerate scale-up of implant removal services in low- and middle-income countries [26,27,28,29,30]. Few studies have assessed the quality of implant insertion or removal services, even as implants skyrocket in popularity. Our landscape assessment identified a disjuncture between self-reported provider confidence in performing removal and checklist-assessed competence performing removal under observation. The limited evidence on provider confidence and competence in implant removal is mixed. Cross-sectional studies in Senegal found that more than 90% of providers trained in implant removal felt confident in providing removal services and clients were generally positive about their access and removal experiences [27, 28].

While all study facilities reported performing removals, we observed a widespread lack of globally recommended equipment and supplies for performing simple and difficult removals, as well as infection prevention materials. Both managers and providers were concerned about the quality of removals performed without adequate equipment and supplies. Providers in Senegal also reported experiencing shortages of equipment and supplies, as well as challenges when performing difficult removals; while 72% had adequate equipment and supplies for simple removals, only 8% could manage difficult removals [27]. However, an EFPC landscape assessment in Nigeria found that 70% of providers struggled to perform implant removals, particularly in cases of deeply inserted implants [31]. Most providers in the Nigeria study lacked knowledge of implant removal steps and reported low confidence in performing removals; no facilities had all equipment and supplies required for implant removal. Providers would benefit from improved checklist-based training, job aids, and supervision; facility readiness could be improved with policies that support effective procurement of the globally recommended standardized list of required supplies and equipment.

Our landscape assessment also highlighted the need to promote development and use of indicators to track implant removals, as well as systems to manage difficult removals, including effective referrals. Even though data on removals can highlight quality of care issues with contraceptive implants, global data on the number of LARC removals is scant because few countries track this indicator. Even more rarely documented are reasons for removal, incidence of difficult removals, complications of removals, and implant discontinuation or switching contraceptive methods [32]. Multiple studies have investigated reasons for and rates of implant discontinuation, but there has been little attention to data collection on implant removals [33, 34]. However, a recent pilot study of providers in Mozambique used a supportive supervision checklist to assess the feasibility and usefulness of tracking five removal indicators recommended by the Implants Access Program task force [32]. Providers were supportive of the indicators, leading the study to recommend inclusion of removal outcome, reason for removal, and duration of use in the HMIS. In response to study findings, the Mozambique MOH has revised the FP register book and is working to integrate the three new indicators in the HMIS. Regarding systems for managing difficult referrals, despite recent recognition that having a referral system in place is essential for provision of quality implant removals [10, 14], there are no studies of referral protocols or pathways for deeply inserted or migrated implants in low- and middle-income countries (LMIC). In higher-resource countries, referral clinics and specialists including plastic surgeons may receive referrals for difficult removals [16], but in LMICs these options may be infeasible, with clients better served by improving local capabilities to perform difficult removal and/or systems that ensure clear and effective referrals to facilities with trained providers, operating theaters, and/or appropriate ultrasonographic or X-ray equipment [31].

At the end of the EFPC project, several other major projects in Burkina Faso were also supporting FP/RH programs. Some have capitalized on program learnings and the stakeholder roadmap, including following MOH requirements pertaining to equipment for removals and ensuring implant removal is integrated into training for health providers. Ongoing monitoring by stakeholders involved in roadmap implementation, with leadership by the MOH, would reveal the extent to which implant removal services are included in these organizations' service delivery programming, capacity building, and future achievements in service of completion of the roadmap. Over the course of the EFPC project, unmet removal need in Burkina Faso as measured in PMA surveys dropped from 7% in 2018 to 3% in 2020, suggesting that national investment in implant removal services, collaborative efforts to engage stakeholders, and other FP/RH programs may be bearing fruit [5, 6].

A number of lessons emerged from this landscape analysis and stakeholder engagement experience (Fig. 3). Improving quality of care requires political will and leadership from the MOH and sustained stakeholder engagement, especially for family planning, as improved access to care does not guarantee quality of care needed to improve maternal health outcomes [35]. The MOH is central to prioritization, leadership, planning, and financing of any sustainable quality improvement activity, and should be involved during the planning phase of a project or intervention [36]. Establishing a culture of stakeholder engagement—or capably navigating the existing culture—requires careful mapping to ensure inclusion of stakeholders (and specific representatives) with high interest and high influence [37]. Additionally, clear communication of priorities and involving stakeholders in consultations at early stages can avoid tokenistic involvement or problems resulting from involving stakeholders too late in the process [37,38,39,40]. When working to secure stakeholder commitments, it is crucial to be sensitive to local organizations that are often most actively involved in providing care, but may concerned about top-down influences over their activities [37, 41]. In a systematic review of interventions in sub-Saharan Africa, local ownership and mobilization were frequently identified by included studies as crucial to sustainability of interventions, both early on and after intervention implementation [42].

Fig. 3
figure 3

Lessons learned

The stakeholder engagement and mobilization approach used in this project could prove useful in other contexts and for issues beyond contraceptive implant removal. A summary of steps for effective stakeholder engagement and mobilization is shown in Fig. 4.

Fig. 4
figure 4

Steps in stakeholder mobilization for data-driven health roadmap development

These ordered steps echo aspects of phases detailed in other emerging models of stakeholder engagement for quality improvement programs and policies, which include situation analyses, mapping, establishing governance, and development of plans for continuous communication and advocacy [35, 43,44,45,46,47]. Amassing and disseminating data revealing poor facility readiness and low provider competence in conjunction with early engagement of key policy players at the MOH fueled FP stakeholder buy-in during the workshops; participatory approaches ensured inclusion of all stakeholders and motivated them to commit to roadmap actions. Supporting development of a culture for data demand and use, including use for advocacy purposes, encourages timely and accurate data collection, leading to improved design of FP interventions in target populations [41]. Following a model of data-driven stakeholder engagement like this one can promote more systematic and meaningful stakeholder involvement, and integration of contributions by key players into a broader strategy for quality improvement.

Conclusion

Driven by dissemination of quantitative and qualitative data that revealed low provider skill and confidence in performing implant removals, as well as poor facility readiness, a coordinated and participatory approach to stakeholder mobilization led by the MOH in Burkina Faso solicited partner contributions and capitalized on organizational strengths. Collecting and presenting data from the landscape assessment to stakeholders at the outset of the mobilization effort addressed misconceptions and sensitized them to the importance of the need for quality implant removal; encouraging MOH leadership enhanced ownership and sustainability of the stakeholder mobilization approach. Use of a roadmap allowed visual assessment of progress toward goals and increased accountability of stakeholders to honor their commitments to achieve priority actions to ensure that quality implant removal is available when desired for all users in Burkina Faso. Only if these commitments are honored by stakeholders will the promise of LARCs—that they are reversible on demand—be realized. The steps followed in this stakeholder mobilization effort form a replicable model for data-driven stakeholder mobilization that is readily transferable to other sectors and projects.

Availability of data and materials

The tools used for the landscape assessment as well as datasets generated and/or analyzed during the current study are available in the FigShare repository at https://doi.org/10.6084/m9.figshare.23705772.v1.

Repository: Figshare.

This project contains the following underlying data:

• Tools: https://doi.org/10.6084/m9.figshare.23705772.v1

• Codebook: https://doi.org/10.6084/m9.figshare.23705769.v1

• Datasets: https://doi.org/10.6084/m9.figshare.23704026.v1

Data are available under the terms of the Creative Commons CC by 4.0 license.

Abbreviations

CHR:

Regional hospital center

CM:

Medical center

CMA:

Medical center with surgical services/primary referral center

CSO:

Civil society organization

CSPS:

Health and social promotion center

DS:

Health district

DSF:

Directorate of Family Health

EFPC:

Expanding Family Planning Choices

FP:

Family planning

FP/RH:

Family planning and reproductive health

HMIS:

Health management information system

IAP:

Implants Access Program

LARC:

Long-acting reversible contraceptive

LMIC:

Low- and middle-income country

MOH:

Ministry of Health

NGO:

Nongovernmental organization

PMA:

Performance Monitoring for Action

RH:

Reproductive health

References

  1. Bertrand JT, Ross J, Sullivan TM, Hardee K, Shelton JD. Contraceptive method mix: Updates and implications. Glob Health Sci Pract. 2020;8(4):666–79. Available from: /pmc/articles/PMC7784075/. Cited 2022 May 18.

    Article  PubMed  PubMed Central  Google Scholar 

  2. Thanel K, Garfinkel D, Riley C, Esch K, Girma W, Kebede T, et al. Leveraging long acting reversible contraceptives to achieve FP2020 commitments in sub-Saharan Africa: The potential of implants. PLoS One. 2018;13(4):e0195228. Available from: https://dx.plos.org/10.1371/journal.pone.0195228. Cited 2022 Apr 10.

    Article  PubMed  PubMed Central  Google Scholar 

  3. Braun R, Grever A. Scaling up access to implants: A summative evaluation of the implants access program. Glob Health Sci Pract. 2020;8(2):205–19.

    Article  PubMed  PubMed Central  Google Scholar 

  4. Institut Superieur des Sciences de la Population (ISSP), The Bill & Melinda Gates Institute for Population and Reproductive Health at the Johns Hopkins Bloomberg School of Public Health. Performance Monitoring and Accountability 2020 (PMA2020) Survey Round 2, PMA2014/Burkina Faso-R2. Ouagadougou, Burkina Faso and Baltimore, Maryland, USA; 2014.

  5. PMA2020. PMA 2020/Burkina Faso. Implant Use and Removal Burkina Faso, 2020. Survey Results Summary. Baltimore, Maryland; 2020.

  6. ISSP, The Bill & Melinda Gates Institute for Population and Reproductive Health at the Johns Hopkins Bloomberg School of Public Health. PMA2017–18/Burkina Faso Implant Use and Removal Memo. Ouagadougou, Burkina Faso and Baltimore, Maryland, USA; 2018.

  7. Ministère de la Santé et de l’Hygiène Publique [Ministry of Health and Public Health] Burkina Faso. Annuaire Statistique de la Santé 2011 [Annual Health Statistics]. Ouagadougou, Burkina Faso; 2011.

    Google Scholar 

  8. Ministère de la Santé et de l’Hygiène Publique [Ministry of Health and Public Health] Burkina Faso. Annuaire Statistique de la Santé 2020 [Annual Health Statistics]. Ouagadougou, Burkina Faso; 2021.

  9. Jacobstein R. Liftoff: The blossoming of contraceptive implant use in Africa. Glob Health Sci Pract. 2018;6(1):17–39.

  10. Christofield M, Lacoste M. Accessible contraceptive implant removal services: An essential element of quality service delivery and scale-up. Global Health Sci Pract. 2016;4(3):366–72.

  11. Sergison JE, Stalter RM, Callahan RL, Rademacher KH, Steiner MJ. Cost of contraceptive implant removal services must be considered when responding to the growing demand for removals. Glob Health Sci Pract. 2017;5(2):330–2.

  12. Jacobstein R, Stanley H. Contraceptive implants: Providing better choice to meet growing family planning demand. Glob Health Sci Pract. 2013;1(1):11–17.

  13. Callahan R, Lebetkin E, Brennan C, Kuffour E, Boateng A, Tagoe S, et al. What goes in must come out: A mixed-method study of access to contraceptive implant removal services in Ghana. Glob Health Sci Pract. 2020;8(2):220–38.

    Article  PubMed  PubMed Central  Google Scholar 

  14. Howett R, Gertz AM, Kgaswanyane T, Petro G, Mokganya L, Malima S, et al. Closing the gap: Ensuring access to and quality of contraceptive implant removal services is essential to rights-based contraceptive care. Afr J Reprod Health. 2019;23:19–26 Women’s Health and Action Research Centre.

    PubMed  Google Scholar 

  15. Howett R, Krogstad EA, Badubi O, Gertz AM, Bawn C, Mussa A, et al. Experiences of Accessing and Providing Contraceptive Implant Removal Services in Gaborone, Botswana: A Qualitative Study Among Implant Users and Healthcare Providers. Front Glob Womens Health. 2021;2:684694. Available from: http://www.ncbi.nlm.nih.gov/pubmed/34816231. Cited 2022 May 18.

    Article  PubMed  PubMed Central  Google Scholar 

  16. Petro GA. Non-palpable and difficult contraceptive implant removals: The new somerset hospital referral-clinic experience. S Afr J Obstet Gynaecol. 2017;23(3):101–4.

  17. Ministère de la santé [Ministry of Health]. Évaluation harmonisée des établissements de santé [Harmonized evaluation of health facilities]. Ouagadougou, Burkina Faso; 2021.

  18. Ministère de la santé [Ministry of Health]. Enquête nationale sur la disponibilité, la capacite opérationnelle et la qualité des soins dans les services de sante [National results on the availability, operational capacity, and quality of health services]. Ouagadougou, Burkina Faso; 2018.

  19. Ministère de la Santé et de l’Hygiene Publique [Ministry of Health and Public Health] Burkina Faso. Plan National d’Accélération de la Planification Familiale du Burkina Faso (PNAPF) 2017–2020 [Burkina Faso National Family Planning Acceleration Plan 2017–2020]. Ouagadougou, Burkina Faso; 2017.

  20. Maternal & Child Survival Program. Providing Long-Acting Reversible Contraception (LARC) Learning Resource Package (Module 10, Implants). 2017. Available from: https://mcsprogram.org/resource/providing-long-acting-reversible-contraception-larc-learning-resource-package/. Cited 2024 Jan 20.

  21. Jhpiego. Contraceptive Implant Removal: Rapid Service Readiness Assessment Tool. 2022. Available from: https://www.jhpiego.org/wp-content/uploads/2022/03/Implant-Removal-Service-Readinessness-Assessment-Tool_FINAL.pdf. Cited 2024 Jan 20.

  22. USAID, Maternal and Child Survival Program. Retrait standard de l’implant [Standard implant removal] (Job aid). Washington, DC; 2020. Available from: https://toolkits.knowledgesuccess.org/sites/default/files/fr-retrait-implant-standard-2020.pdf. Cited 2022 Oct 19.

  23. USAID, Maternal and Child Survival Program. Retrait d’un implant insere profondement [Removal of deeply inserted implant] (Job aid). Washington, DC; 2020.

  24. Jhpiego, USAID, Population Services International (PSI). Algorithm for non-palpable implant removal decision making. Baltimore, Maryland; 2017.

  25. Ministere de la Sante [Ministry of Health] Burkina Faso. Guide technique de la prevention et controle des infections associees aux soins au Burkina Faso [Technical guide for the prevention and control of care-associated infections in Burkina Faso]. Ouagadougou, Burkina Faso; 2018.

  26. Howett R, Krogstad EA, Badubi O, Gertz AM, Bawn C, Mussa A, et al. Experiences of Accessing and Providing Contraceptive Implant Removal Services in Gaborone, Botswana: A Qualitative Study Among Implant Users and Healthcare Providers. Front Glob Womens Health. 2021;2:684694. Available from: http://www.ncbi.nlm.nih.gov/pubmed/34816231. Cited 2024 Jan 20.

    Article  PubMed  PubMed Central  Google Scholar 

  27. Brunie A, Lydon MM, Ndiaye S, Aw FNRS, Lebetkin E, Cartwright A, et al. Ensuring sufficient service capacity for removals of long-acting reversible contraceptives: a mixed-method study of provider experiences in Senegal. Gates Open Res. 2022;6:46. Available from: http://www.ncbi.nlm.nih.gov/pubmed/35919828. Cited 2024 Jan 20.

    Article  PubMed  PubMed Central  Google Scholar 

  28. Brunie A, Sarr Aw FNR, Ndiaye S, Dioh E, Lebetkin E, Lydon MM, et al. Making Removals Part of Informed Choice: A Mixed-Method Study of Client Experiences With Removal of Long-Acting Reversible Contraceptives in Senegal. Glob Health Sci Pract. 2022;10(5). Available from: https://pubmed.ncbi.nlm.nih.gov/36316132/. Cited 2024 Jan 20.

  29. Reiss K, Penfold S, Alabi O, Ali M, Hopkins K, Ngo TD, et al. Safety, Quality, and Acceptability of Contraceptive Subdermal Implant Provision by Community Health Extension Workers Versus Nurses and Midwives in Nigeria: Protocol for a Quasi-Experimental, Noninferiority Study. JMIR Res Protoc. 2018;7(3):e67. Available from: http://www.ncbi.nlm.nih.gov/pubmed/29500162. Cited 2024 Jan 20.

    Article  PubMed  PubMed Central  Google Scholar 

  30. Charyeva Z, Oguntunde O, Orobaton N, Otolorin E, Inuwa F, Alalade O, et al. Task shifting provision of contraceptive implants to community health extension workers: Results of operations research in Northern Nigeria. Glob Health Sci Pract. 2015;3(3):382–94. Available from: https://pubmed.ncbi.nlm.nih.gov/26374800/. Cited 2024 Jan 20.

    Article  PubMed  PubMed Central  Google Scholar 

  31. Adetiloye O, Danladi A, Haws R, Anoke C, Odio B, Ugwa E, et al. What is needed to improve quality of implant removal services in Nigeria? results of a landscape assessment. Front Glob Womens Health. 2023;4. Available from: https://pubmed.ncbi.nlm.nih.gov/37034399/. Cited 2024 Jan 20.

  32. Jacinto A, Ronda AV, Lee C, Fikree FF, Ramirez-Ferrero E. Introducing Long-Acting Contraceptive Removal Indicators in a Pilot Study in Mozambique: Dynamics of Discontinuation and Implications for Quality of Care. Glob Health Sci Pract. 2022;10(1). Available from: /pmc/articles/PMC8885348/. Cited 2024 Jan 22.

  33. Schwandt H, Boulware A, Corey J, Herrera A, Hudler E, Imbabazi C, et al. Family planning providers and contraceptive users in Rwanda employ strategies to prevent discontinuation. BMC Womens Health. 2021;21(1). Available from: /pmc/articles/PMC8504084/. Cited 2022 Sep 6.

  34. Qiu M, Juarez J, de Carvalho A, Juliana FJC, Nhamba L, Neves I, et al. Contraceptive Implant Discontinuation in Huambo and Luanda, Angola: A Qualitative Exploration of Motives. Matern Child Health J. 2017;21(9):1763–71.

    Article  PubMed  Google Scholar 

  35. Spencer J, Gilmore B, Lodenstein E, Portela A. A mapping and synthesis of tools for stakeholder and community engagement in quality improvement initiatives for reproductive, maternal, newborn, child and adolescent health. Health Expectations. 2021;24(3):744–56. Available from: https://onlinelibrary.wiley.com/doi/10.1111/hex.13237. Cited 2022 Sep 6.

    Article  PubMed  PubMed Central  Google Scholar 

  36. Milat AJ, King L, Newson R, Wolfenden L, Rissel C, Bauman A, et al. Increasing the scale and adoption of population health interventions: Experiences and perspectives of policy makers, practitioners, and researchers. Health Res Policy Syst. 2014;12(1):18.

    Article  PubMed  PubMed Central  Google Scholar 

  37. Masefield SC, Msosa A, Chinguwo FK, Grugel J. Stakeholder engagement in the health policy process in a low income country: a qualitative study of stakeholder perceptions of the challenges to effective inclusion in Malawi. BMC Health Serv Res. 2021;21(1):984. Available from: https://bmchealthservres.biomedcentral.com/articles/10.1186/s12913-021-07016-9. Cited 2022 Sep 5.

    Article  PubMed  PubMed Central  Google Scholar 

  38. Gilmore B, Vallières F, McAuliffe E, Tumwesigye NM, Muyambi G. The last one heard: The importance of an early-stage participatory evaluation for programme implementation. Implementation Science. 2014;9(1):137. Available from: http://implementationscience.biomedcentral.com/articles/10.1186/s13012-014-0137-5. Cited 2022 Sep 6.

    PubMed  PubMed Central  Google Scholar 

  39. Covello VT. Stakeholder Engagement and Empowerment. In: Communicating in Risk, Crisis, and High Stress Situations. Wiley; 2021. p. 87–109.

  40. Akwanalo C, Njuguna B, Mercer T, Pastakia SD, Mwangi A, Dick J, et al. Strategies for Effective Stakeholder Engagement in Strengthening Referral Networks for Management of Hypertension Across Health Systems in Kenya. Glob Heart. 2019;14(2):173–9. Available from: https://europepmc.org/articles/PMC7250005. Cited 2022 Sep 5.

    Article  PubMed  Google Scholar 

  41. Mwaikambo L, Brittingham S, Ohkubo S, Salem R, Sama DJ, Sow F, et al. Key factors to facilitate locally driven family planning programming: a qualitative analysis of urban stakeholder perspectives in Africa and Asia. Global Health. 2021;17(1):75. Available from: https://globalizationandhealth.biomedcentral.com/articles/10.1186/s12992-021-00717-0. Cited 2022 Sep 5.

    Article  PubMed  PubMed Central  Google Scholar 

  42. Iwelunmor J, Blackstone S, Veira D, Nwaozuru U, Airhihenbuwa C, Munodawafa D, et al. Toward the sustainability of health interventions implemented in sub-Saharan Africa: A systematic review and conceptual framework. Implement Sci BioMed Central Ltd. 2016;11:43.

    Article  Google Scholar 

  43. World Health Organization. Integrating stakeholder and community engagement in quality of care initiatives for maternal, newborn and child health. Geneva; 2020. Available from: https://www.who.int/publications/i/item/9789240006317. Cited 2022 Sep 6.

  44. Murphy JK, Michalak EE, Colquhoun H, Woo C, Ng CH, Parikh SV, et al. Methodological approaches to situational analysis in global mental health: a scoping review. Global Mental Health. 2019;6(e11):1–13 Available from: /pmc/articles/PMC6582459/. Cited 2022 Sep 5.

    Google Scholar 

  45. Orem J, Mafigiri D, Marchal B, Ssengooba F, MacQ J, Criel B. Research, evidence and policymaking: The perspectives of policy actors on improving uptake of evidence in health policy development and implementation in Uganda. BMC Public Health. 2012;12:109.

    Article  PubMed  PubMed Central  Google Scholar 

  46. Nabyonga Orem J, Marchal B, Mafigiri D, Ssengooba F, Macq J, Da Silveira VC, et al. Perspectives on the role of stakeholders in knowledge translation in health policy development in Uganda. BMC Health Serv Res. 2013;13(1):324. Available from: https://bmchealthservres.biomedcentral.com/articles/10.1186/1472-6963-13-324. Cited 2022 Sep 5.

    Article  PubMed  PubMed Central  Google Scholar 

  47. Knowledge for Health. Stakeholder Engagement for Family Planning Costed Implementation Plans A four-step action framework to meaningfully engage stakeholders in the CIP process Costed Implementation Plan Resource Kit. Research Triangle Park, NC; 2018. Available from: www.k4health.org. Cited 2022 Sep 6.

Download references

Acknowledgements

We express our appreciation to the colleagues who provided guidance on this work, from conception of the project through the landscape assessment, and beyond. Our special thanks go to the Burkina Faso Ministry of Health and Public Hygiene, including the Department of Family Health, for their close engagement throughout the project. We appreciated the active participation from stakeholders throughout this process and their continued engagement to improve access to quality contraceptive implant removal services in Burkina Faso.

Funding

The project on which the article is based was funded by the Bill and Melinda Gates Foundation.

Author information

Authors and Affiliations

Authors

Contributions

JT designed and directed the project. JT, BA, and YO contributed to the design and implementation of the landscape assessment and stakeholder mobilization strategy. JT, BA, and RH drafted, edited, and revised the manuscript with inputs from other authors. RH conceived the manuscript outline. LPG led clinical data collection for the landscape assessment and implementation of the roadmap. JT, BA, YO, LPG, MG, AC, and MB contributed to stakeholder workshops and roadmap development. MG contributed to the analysis of results of the landscape assessment. VO and AC participated in implementation of the landscape assessment and writing of the manuscript. All authors provided critical feedback and shaped the research, analysis, and development of the manuscript. All authors read and approved the final manuscript.

Corresponding author

Correspondence to Bethany Arnold.

Ethics declarations

Ethics approval and consent to participate

The landscape assessment protocol was approved by the Burkina Faso Health Research Ethics Committee and by the Johns Hopkins University Institutional Review Board, which granted a non-research determination. All study participants provided informed written consent.

Consent for publication

Not applicable.

Competing interests

The authors declare no competing interests.

Additional information

Publisher’s Note

Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Supplementary Information

Rights and permissions

Open Access This article is licensed under a Creative Commons Attribution 4.0 International License, which permits use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons licence, and indicate if changes were made. The images or other third party material in this article are included in the article's Creative Commons licence, unless indicated otherwise in a credit line to the material. If material is not included in the article's Creative Commons licence and your intended use is not permitted by statutory regulation or exceeds the permitted use, you will need to obtain permission directly from the copyright holder. To view a copy of this licence, visit http://creativecommons.org/licenses/by/4.0/. The Creative Commons Public Domain Dedication waiver (http://creativecommons.org/publicdomain/zero/1.0/) applies to the data made available in this article, unless otherwise stated in a credit line to the data.

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Tiendrebeogo, J., Arnold, B., Ouedraogo, Y. et al. Mobilizing stakeholders for implant removals in Burkina Faso using landscape assessment data. BMC Women's Health 24, 301 (2024). https://doi.org/10.1186/s12905-024-03121-z

Download citation

  • Received:

  • Accepted:

  • Published:

  • DOI: https://doi.org/10.1186/s12905-024-03121-z

Keywords